Well I know it has been a while but what the heck it has been raining and I did not think that a lot of pictures building the Vanity, over the stove and over the fridge cupboards would be very exciting. Any how Jim came up and gave me a hand hanging the two kitchen cupboards
and hooking up the under the kitchen sink drains. So, there you go, Matt.
Saturday, August 7, 2010
My aching back those pressure treated poles are really really heavy. Friday was the day we decided to get the holes dug and the poles up. Dave the inspector showed up right on time and we were able to get on with planting the green treated forest, 25 big heavy poles
. In the last week I have been working on the bath vanity, the over the fridge and the over the stove cabinets. The weather is supposed to be wet all of next week and I might have no choice but to go back in the shop and work some more on the cabinets.