Wednesday, June 16, 2010
The tile cured overnight and needed a little cleaning of the grout line areas before we could apply the grout. Andrea did all of the tile cleanup and they look great. I loaded all of the trim 1 X 6 and 1 X 8 ash trim boards up and brought them up this morning. After the tile was done we started on the trim as you can see in the pictures what do you think of the cute 30 inch fan.