Tuesday, February 9, 2010
Yes I know that is a terrible pun and I apologize. The cabinet boxes are going together nicely
I should be able to get the last base cabinet box done tomorrow and that will leave the floor to ceiling double wall oven and the two upper cabinets. After the kitchen I will have the main bathroom vanity which wont take very long.
Monday, February 8, 2010
All of the
base cabinets have all of the parts cut and are ready for assembly. These are pictures of the prototype four drawer base I still need to cut all of the drawer parts then assemble and veneer the boxes. I must admit it is nice to be inside in the heated shop.
Thursday, February 4, 2010
That was the question Jim asked as we were carrying the 3/4 inch melamine sheets from the garage to the shop. I must say the melamine sheets are about a hundred pounds or they sure seemed like it by the time we got them into the shop
after walking on some very**#**## icy sidewalks. It really does not look like a lot but these 17 sheets of plywood and chip board will be the kitchen cabinets in a couple of weeks. as the weather is still in the crapper I am continuing to help Jim with his stairs and paneling.
