www.flickr.com
This is a Flickr badge showing public photos and videos from cordialwood. Make your own badge here.
Thursday, October 22, 2009
 
The ceiling is high
And so am I from the fumes of the lacquer whew that is some strong fumes. The electrical inspector came today and did the first of two (I hope ) rough in inspections and He gave the go ahead to putting up the ceiling. By the time he arrived I was already putting lacquer on the bathroom ceiling joists and the ceiling side of the floor which is 2 by 6 tongue and grooved red oak to span between the 4 by 6 joist. as the pictures show I got the first coat of the lacquer on and will start putting the flooring on tomorrow.


html web counter