Friday, October 30, 2009
This one is for Jim take a look at the picture of the pile of tongue and groove
we prepped yesterday. Yes I finished the whole pile.
Wednesday, October 28, 2009
Today we finished putting up the 2ND floor insulation and the vapor barrier. Then we went to work on the cleaning and vapor barrier on the main floor. Thursday will see the end of putting up vapor barrier and we will be able to start lacquering the tongue and groove paneling for the ceiling.
Monday, October 26, 2009
It looks just like one but the fiberglass
sure is an irritation. We got it put up on Monday and you can already tell the difference.
Friday, October 23, 2009
With a little help from my friends. Jim came up today and Jay from Woodland Improvements stopped by also. As you can see in the photo Jay jumped right in and helped put up the second floor ballroom. I have to say it looks good and the added benefit is that it happens to also be the ceiling of the bathroom. I am very impressed with 2 X 6 tongue and groove flooring.
Thursday, October 22, 2009
And so am I from the fumes of the lacquer whew that is some strong fumes. The electrical inspector came today and did the first of two (I hope ) rough in inspections and He gave the go ahead to putting up the ceiling. By the time he arrived I was already putting lacquer on the bathroom ceiling joists and the ceiling side of the floor which is 2 by 6 tongue and grooved red oak to span between the 4 by 6 joist. as the pictures show I got the first coat of the lacquer on and will start putting the flooring on tomorrow.

Friday, October 16, 2009
I am continuing to get the rough in wiring done and in the hope that we could put in the oak flooring of the library/ ceiling of the bath.
This would make it a lot easier to wire the outlets and lights upstairs.
Wednesday, October 14, 2009
I have been told that I need to do a little more blogging even if what I am doing is kind of boring to Me. Here it is, Today I stuffed R30 insulation into the false post cavities and I wired outlets and we also framed the first wall. On the false posts I also started sealing them with clear packaging tape.
Monday, October 12, 2009
I envy the person that purchases a set of plans with every outlet and switch laid out and proven to be in the right spot. I on the other hand must surmise the finest location for every outlet and switch, all by my lonesome. Oh the trials I must endure, ain't it fun.
Tuesday, October 6, 2009