Thursday, September 17, 2009
It has been a very productive week, all of the first floor sofit has been applied and trimmed to length. Wednesday evening I picked up the doors and hardware what a load that was. We installed all three doors and hardware today, they look great. Tomorrow Mary and I are heading up to Grand Rapids
they are having a lumber show and the Garn boiler will be on display. We need to make a final decision on the heating system and as of this time it is the Seton boiler or the Garn boiler.